Eren Energy
Eren Energy
Date: 01.04.2015 – 01.07.2015
Place: Zonguldak, Çatalağzı
Project overview: 11.000 m³ of scaffolding material was used in the maintenance works.
Date: 01.04.2015 – 01.07.2015
Place: Zonguldak, Çatalağzı
Project overview: 11.000 m³ of scaffolding material was used in the maintenance works.