Rönesans Holding
Rönesans Holding
Date: 02.01.2019 – 31.08.2019
Place: Ankara,Presidential Palace
Project overview: 100.000 m³ of scaffolding material was used in the works.
Date: 02.01.2019 – 31.08.2019
Place: Ankara,Presidential Palace
Project overview: 100.000 m³ of scaffolding material was used in the works.